The Project

Replacing Diesel On The Construction Of Melbourne’s North East Link

The construction industry in Australia contributes significantly to both the national and global economy. However, heading towards 2030 and beyond, a major challenge is its heavy reliance on diesel, which accounts for a substantial share of Australia’s carbon emissions.

With growing pressure to reduce emissions, tier one infrastructure companies like ACCIONA are actively exploring innovative solutions to meet ambitious carbon targets. For ACCIONA, this meant searching for sustainable solutions to power equipment on Melbourne’s North East Link project.

The solution needed to effectively manage the high and consistent power demands of heavy construction equipment, without compromising emission reduction targets.

The Solution

The GEH2 Hydrogen Fuel Cell Generator & BESS

Blue Diamond Machinery provided ACCIONA with the GEH2 Hydrogen Generator and a 450kW Battery Energy Storage System (BESS), as a diesel-free solution to power Australia’s first electric piling rig.

The GEH2 acts as the primary power source, supplying energy to the BESS, which is conveniently transported to site on a flatbed truck. Once on site, the BESS is connected directly to the LB30 electric rig, delivering a reliable power supply. Together, this setup creates a fully off-grid, zero-emission power solution.

The Outcome

Sustainable Construction Power Without Compromise

The combined GEH2 hydrogen fuel cell and battery energy storage system will continue to deliver consistent and clean power throughout the duration of the project.

Construction crews on site at the project have embraced the new technology, benefiting from the quieter, low-emission operation compared to traditional diesel-powered systems. By implementing Blue Diamond’s zero-emission solution, ACCIONA and Geotech are demonstrating that it’s possible to meet carbon reduction targets without compromising on performance.

This project offers a compelling example for other tier-one contractors seeking to adopt clean energy technologies across major infrastructure works.

If your business is looking to integrate tailored clean energy solutions, Blue Diamond can help. Our team works with you from the ground up- planning a solution that fits your site’s unique needs.