Erben was looking for a sustainable solution to not only achieve a 5 star Green Star rating, but to also solve their everyday on-site challenges. The solution needed to address restrictive site access, fuel logistics, noise and carbon pollution.
AMPD Enertainer Powers Erben’s Cirque Duet – WA’s First 5 Star Green Star Rated Building
Client:
ErbenLocation:
Mount Pleasant, WASectors:
ConstructionActing as a replacement for large diesel generators, AMPD’s Enertainer BESS unit aims to eliminate noise and air pollution challenges for construction sites. The Enertainer’s compact design is ideal for the site’s restrictive access, while the lithium-ion battery technology removes the hassle of disruptive refuelling and fuel logistics. The unit also features an EnerNet analytics platform for simple remote monitoring.
Our 500kW Enertainer unit provided the Cirque Duet development with access to a low-carbon drop-in solution to replace diesel as baseload power. It helped Erben achieve WA’s first 5 Star Green Star rated residential building. The Enertainer’s compact design also went on to solve on-site obstacles like restrictive access challenges, while eliminating noise and air pollution disruption and solving fuel logistics hassles.
The Enertainer is estimated to reduce carbon emissions on the project by nearly 12 tonnes per month – an equivalent saving of 7000 litres of diesel per month.