Water Corporation: Distributing Ongoing, Stable Power For Government Projects

Blue Diamond Machinery synchronised 2 Denyo diesel generators to distribute reliable, scalable power for on-site government projects.

Client:

Water Corporation

Location:

Various

Sectors:

Government

The Challenge

Power Disruption, Delays & Heavy Fuel Costs

Water Corporation was in need of a scalable, reliable power solution that optimised load management while omitting the risk of power disruption, delays and heavy fuel costs.

Costly fuel consumption

Power disruptions

Refuelling delays

The Solution

Optimal Load Management, Reliability & Efficiency

Blue Diamond Machinery provided Water Corporation with 2 Denyo Powered DCA-150ESK generators with ComAp500 controllers for synchronisation. Working in sync, the two generators were able to provide stable, reliable power while helping control load management and easing maintenance roadblocks. This ensured the system ran smoothly throughout the entire project.  

Blue Diamond Machinery also completed a series of in-house upgrades. This included a smoke/fire sensor, fuel supply 3-way valve, 110% steel bund with forklift points, battery isolate, fire extinguishers, 2 x emergency stops, 4 hours of FAT testing, and heavy-duty AGM River batteries.

2x Denyo Powered Generators

In house upgrades

Optimised load management

The Outcome

Optimised, Reliable & Continuous Power

Synchronising the two Denyo generators together allowed Water Corporation to run government projects efficiently and within a tight deadline. The site had the reassurance of unlimited power without the heavy burden of dealing with a costly fuel economy.

Efficient power supply

Less downtime

Continuous power supply