Multiplex was in need of reliable, energy-efficient power to handle a large-scale construction site without the costly and disruptive use of diesel fuel. They were looking for a solution to address on-site noise pollution, high emission output and overall worker safety.
The Grove: BESS Power for Large-Scale Construction Site
Client:
MultiplexLocation:
The Grove, WASectors:
Construction
The Challenge
Inefficient Power for Large-Scale Construction
Inefficient fuel consumption
Disruptive noise pollution
On-site exhaust emissions
The Solution
The Battery Energy Storage System Unit
Blue Diamond Machinery supplied a 500kW Battery Energy Storage System unit to ensure construction-scale, low emission power. This system was able to power a four-building project comprising two high-rise residential towers, and two buildings offering resort style amenities. It successfully powered the site using the electrical grid without relying on a diesel generator.
100% elimination of direct emissions
Replaces diesel generators
Construction-scale power output
The Outcome
85% Overall Carbon Savings
Using battery energy storage, the BESS unit saved the construction site an 85% reduction in CO2 emissions and an 80% reduction in overall fuel costs. Without the need of a diesel generator, it eliminated direct on-site emissions and drastically lowered noise pollution, resulting in a cleaner, quieter site for both workers and residents
Eliminates diesel handling
Saves on overall operational expenditure
Zero on-site & visual pollution








