Mirvac Save Over $260,000 By Replacing Diesel Generators With BESS On Construction Project

Mirvac deployed a Battery Energy Storage System to overcome issues with insufficient grid power for a residential construction project.

Client:

Mirvac

Location:

Brunswick, Victoria

Sectors:

Construction

The Project

Insufficient Grid Power For A Residential Construction Project

Blue Diamond Machinery was contracted to supply a reliable power source for Mirvac’s ‘Albert Fields’ development in Brunswick, Victoria. The site only had access to 315 amps of power from the electricity grid, leading Mirvac to investigate alternate power sources to operate the site’s 5 Alimak hoists.  

The Solution

Battery Energy Storage Systems (BESS)

Blue Diamond Machinery supplied Mirvac with a Battery Energy Storage System (BESS). With an estimated load of 600 amps, this system is an ideal drop-in solution to supplement, or completely replace diesel generators when grid power is insufficient.  

Designed with construction sites in mind, BESS can comfortably power high-load construction equipment like hoists and tower cranes. The unit’s lithium-ion battery technology delivers quiet, reliable power without diesel exhaust fumes, helping companies like Mirvac reach their efficiency and carbon reduction targets.  

This is just one of many applications of BESS for construction sites. 

The Outcome

Significant Energy Savings & Operational Efficiency

Since implementing the BESS, the site has experienced significant energy savings and operational efficiency throughout the project. It’s estimated that using BESS on the project to power the Alimaks, as opposed to diesel generators, has resulted in a saving of $260,000 to date. 

Blue Diamond Machinery is proud to pioneer these clean power solutions in Australia. If you’re looking for sustainable, efficient power for your next project, we’re here to help. 