Australia’s leading total water management company, Welltech, was in need of reliable, fuel-efficient power to operate a large-scale critical sewer bypass pumping project in Epsom. Power was needed to run critical sewer bypass systems over the duration of 7 months.
Welltech – Powering a Critical Sewer Bypass Pumping Project
Blue Diamond Machinery provided 20 heavy-duty Denyo generators to power critical sewer bypass systems for a large-scale project in Epsom.
Client:
Welltech Total Water ManagementLocation:
Epsom, MelbourneSectors:
Construction
Dont Delete!
The Solution
20 Heavy Duty Denyo Generators
Blue Diamond Machinery were called in to supply 20 highly robust, custom optimised Denyo Generators to successfully operate the sewer bypass project over the seven-month period. Denyo are one of the leading diesel generator brands, specialising in fuel efficient, highly robust and high performing power for large-scale construction and mining applications.
Lorem Ipsum
Lorem Ipsum
Lorem Ipsum
The Outcome
Fuel Efficient, Low Noise & Low Emission Output
Providing consistent, fuel efficient and faultless power, the Denyo generators successfully drove the seven-month project to completion without hassle. The generator’s low noise and emission output ensured positive feedback from the community.
Lorem Ipsum
Lorem Ipsum
Lorem Ipsum
Our Case Studies
Our Other Relevant Projects
Blue Diamond supplied ACCIONA with a zero-emission solution combining a hydrogen generator and battery energy storage system (BESS), to sustainably power construction on Victoria’s largest road project.
Find Out MoreBESS, Construction, GEH2
Hickory deployed Battery Energy Storage Systems as a low-emission, low-noise solution for temporary power on site.
Find Out MoreBESS, Construction
BESS Units Save Over 120,000L of Diesel On Built-To-Rent Construction Project
Hickory integrated Battery Energy Storage Systems as a quiet, low-emission alterative to diesel generators on an urban construction project.
Find Out MoreBESS, Construction
Hickory Cut Carbon Emissions by Over 15 Tonnes on Redevelopment Project
Property development company Deicorp integrated BESS units with their existing electrical grid supply to efficiently power a construction project in Sydney.
Find Out MoreBESS, Construction
Deicorp Saves Over 23 Tonnes Of CO2 Emissions On Construction Project With Battery Energy Storage Systems
Mirvac deployed a Battery Energy Storage System to overcome issues with insufficient grid power for a residential construction project.
Find Out MoreBESS, Construction
Mirvac Save Over $260,000 By Replacing Diesel Generators With BESS On Construction Project
Construction company Kapitol Group deployed BESS to replace diesel as the primary source of construction power on a residential project in Victoria.
Find Out MoreBESS, Construction
Kapitol Group Combats Limited Grid Power With Battery Energy Storage Systems
Leading construction material company Holcim adopted a Battery Energy Storage System (BESS) to replace diesel as the primary source of power on concrete batch plant in Rooty Hill.
Find Out MoreBESS, Construction
Hybrid Power Solution for Off-Grid Concrete Batching Plant
Construction company Hacer adopted a Battery Energy Storage System for all onsite power usage to combat issues with grid reliability and diesel fuel expenditure.
Find Out MoreBESS, Construction
Battery Energy Storage Solution Combats Grid Reliability for Construction Site
Utilities infrastructure company Rob Carr adopted two Battery Energy Storage Systems for a tunnel boring operation for Sydney Water. This type of work requires a significant off-grid power supply, and Blue Diamond Machinery were proud to provide a sustainable alternative to 100% diesel reliance.
Find Out MoreBESS, Construction
Powering Tunnel Boring Machines with Hybrid Power Solution
Construction company Kapitol Group adopted two Battery Energy Storage Systems (BESS) as a diesel-free solution to power tower cranes on a Microsoft data centre construction project in Victoria.
Find Out MoreBESS, Construction
Battery Energy Storage System (BESS) Powers Tower Cranes On A Data Centre Construction Project
Partnering with Kennards Hire, our 45kVA POWR2 POWERBANK was used as a 24/7 power source during the construction of the M4-M5 Sydney WestConnex tunnels.
Find Out MoreBESS, Construction, POWR2, Rental
Kennards Hire: BESS Powers The Construction Of The M4-M5 Sydney WestConnex Tunnels
Sustainability focused developer Erben adopted a 500kW Battery Storage System (BESS) Unit as a diesel-free solution for their Cirque Duet residential apartment development in Mount Pleasant.
Find Out MoreAMPD, BESS, Construction
BESS Powers Erben’s Cirque Duet – WA’s First 5 Star Green Star Rated Building
Our Battery Energy System unit was used as a diesel fuel replacement to power on-site tower cranes for LendLease's Wyndham Law Court development.
Find Out MoreBESS, Construction
Powering Tower Cranes With Battery Energy Storage Systems
Our Battery Energy Storage System was used to replace onsite diesel power generation at Multiplex’s mixed use development, ‘The Grove’.
Find Out MoreBESS, Construction
The Grove: BESS Power for Large-Scale Construction SiteÂ
Blue Diamond Machinery customised a hybrid power solution to power up site offices during construction of Whiteman Park Train Station.
Find Out MoreConstruction, Hybrid
Laing O’Rourke: Hybrid Power System for Whiteman Park
Blue Diamond Machinery provided a hassle-free water management solution for a long-term train line project from Morley to Ellenbrook.
Find Out MoreConstruction
Construction Dewatering Solution Keeps Infrastructure Project Running
Blue Diamond Machinery supplies BON with a reliable and robust generator fleet as well as industry-leading after sales service and support on all generator models.
Find Out MoreConstruction
Our Partnership with BON
Blue Diamond Machinery synchronised 2 Denyo diesel generators to distribute reliable, scalable power for on-site government projects.
Find Out MoreConstruction, Diesel
Water Corporation: Distributing Ongoing, Stable Power For Government Projects
Blue Diamond Machinery supplied Premium Italian-made Generac Dust Fighters and Lighting Towers to provide customised delivery of light and dust control for the duration of a demolition project at Subiaco Oval.
Find Out MoreConstruction, Lighting Towers
Brajkovich Demolition: Optimal Dust & Light Control For Demolition Project
Blue Diamond Machinery customised 3 Perkins generator units to power up a welder during the Fortescue Railway Project.
Find Out MoreConstruction
Linkforce: Prime & Standby Power For Fortescue Railway Project
Blue Diamond Machinery provided FMG with custom built load banks to ensure all on-site generators were optimised and capable of running smoothly throughout day-to-day operations.
Find Out MoreConstruction