Turnkey 2MW Power System for NT Mining Wastewater Facility

Blue Diamond Machinery recently delivered and commissioned a customised 2MW mine-spec generator system to power a remote wastewater facility in the Northern Territory.

Client:

Tier 1 Mining Operator

Location:

Northern Territory

Sectors:

Mining

Providing power for a remote wastewater treatment facility

This containerised 2MW generator was supplied on an accelerated timeline to support a multi-generator synced system. The deployment showcases our engineering team’s ability to deliver high-voltage, mission-critical site power.

Turnkey 2MW Mine Power System

Project Specs

Power System Specs 

  • Power Output:
    • Prime: 1,600kW
    • Standby: 1,760kW
  • Voltage: 11kV
  • Engine: Cummins QSK60
  • Alternator: Stamford UCI alternator
  • Controller: ComAp IG-1000
  • Switchgear: ABB High Voltage Sync Gear
  • Application: Synchronized operation with multiple gensets for site-wide base load
  • Site: Remote NT wastewater facility

Engineered features:

  • Heavy-duty containerised build

  • Large roof-mounted cooling hatches

  • Dual mufflers for noise compliance

  • Full-service access with multiple side doors

  • Safety ladder + cage

  • ComAp control for engine telemetry and remote access

  • Sync-ready switchgear for multi-gen operations

turnkey generator set built for powering remote wastewater treatment facility in Northern Territory