A lithium crushing plant in Northern Territory was in need of robust power to efficiently operate daily duties. The site was in need of a highly customised generator synchronisation solution to ensure minimal generator down-time to complete operations.
CAT Primero: Off-Grid Power Supply for Lithium Crushing Plant
Client:
PrimeroLocation:
Northern TerritorySectors:
MiningBlue Diamond Machinery supplied 5 x highly–customised CAT generators – 3 x 650kVa prime power, 2 x 715kVa standby power, and a 16,000L fuel tank. The generators were upgraded in-house to run in synchronisation to help push out service intervals. It also leaves critical power redundancies onsite for breakdowns and unforeseen maintenance. Each generator is fitted with highly–customised modifications specially designed for the mine site environment and operations.
Using a highly customisable fleet of generators ensures reliable, readily available power for the continuous operation of the crushing plant. Generator synchronisation also significantly lowers overall fuel costs, generator longevity and lessens service intervals.